Community Engagement and Wellbeing: Supplementary Guidance Document
Resource Key: W8NVLLUY
Document Type: Report
Creator:
Creators Name:
Place: Suffolk, United Kingdom
Institution: Suffolk County Council
Date: September 2024
Language: en
This is a supplementary guidance document, to support the Energy and Climate Adaptive Infrastructure Policy, which was adopted by Suffolk County Council’s cabinet, on the 16th of May 2023. The scope and purpose of this Supplementary Guidance Document Suffolk has natural and geographic advantages that make it attractive to project promoters for locating low-carbon technologies, and the consequent supporting infrastructure. This, therefore, creates significant challenges for the local economy, environment, and communities of Suffolk. The Council considers that it is essential for project promoters to engage effectively and collaboratively with communities. Project promoters must have consideration for the impacts of their project on community wellbeing, both alone and in combination with other proposals, during all phases of the project, from the earliest stages of the pre-application period, through consenting, and during construction. In doing so, project promoters should recognise that: • Individual energy and climate adaptive projects are part of a substantial, significant, widespread, and ongoing succession of infrastructure developments in this region, that are necessary to mitigate the impacts of, and adapt to the changing climate. • Public understanding of the amount, extent, and speed of this requirement for new infrastructure is generally low, or at best, inconsistent. • The technical processes of the national infrastructure consenting regime are neither appropriate, nor sufficient by themselves, to ensure that communities have an effective understanding of, and engagement with, the processes and delivery of change. • The Nationally Significant Infrastructure Planning (NSIP) process is perceived by the public as exclusive and exclusory, being the province of experts, bureaucrats, and non-departmental public bodies. This characterisation of public perception is backed up by research, as well as the Council’s experience of previous projects. • The consenting process results in significant adverse impacts on community wellbeing, particularly where multiple projects are being consulted on and consented across the same communities. • Distributional fairness, such as community benefits, or shared community ownership, are a necessary addition to, rather than a substitute for, procedural fairness, which must be created through effective dialogue with the affected communities. Project promoters have critical obligations to ensure procedural fairness, as defined by the Gunning Principles, given the inherent imbalance of power between the project promoter and communities. This is essential to ensure a fair process, secure trust in the process, and as a result, safeguard community wellbeing. This is likely to require the project promoter to go beyond the regulatory or legislative minimum, throughout project design, consenting, and construction. As such, it is critical for the project promoter, to: • Provide communities with a genuine opportunity to engage in collaborative dialogue with the promoter, allowing communities to shape the emerging project effectively and demonstrably, from the earliest possible stage of its design and development. • Ensure that effective engagement methods and approaches with host communities, as well as appropriate community mitigation, are established for the construction, and where appropriate, the operational or decommissioning phases of the project. The purpose of this Supplementary Guidance Document is to outline in principle how the Council expects project promoters to: 1. Secure effective dialogue with communities about change, through their engagement with those who are expected to host NSIP proposals, to ensure a fair process and to protect community wellbeing. 2. Ensure assessment of community wellbeing, as part of the Environmental Impact Assessment. 3. Secure and safeguard community wellbeing, through effective and robust mitigation measures, that minimise or eliminate the adverse impacts of pre application engagement, consenting, and construction. The Council recognises that community wellbeing, and the adverse impacts on it of infrastructure projects, is a relatively new and developing field of interest, therefore, the Council will continue to review and update this guidance appropriately. The need for the consideration of community wellbeing impacts Through discussion with communities in Suffolk, that are experiencing the impacts of multiple NSIP schemes, the Council has identified that these communities feel that project promoters have, in forming and promoting their proposals, overlooked the adverse impact this has on community wellbeing. Feelings of fear, mistrust, anger, and frustration are all reported, along with impacted sleep, and inability to plan for the future, due to the uncertainty created by the proposed development. These concerns echo feedback received by the Suffolk Emotional Needs Audit, carried out by Suffolk Mind in 2022. The audit showed that for people living in the Saxmundham, Leiston, and Aldeburgh area, (that in addition to Sizewell C, hosts multiple energy projects) the least met needs were Community, Security, and Control, and when asked what could improve wellbeing locally, responses included: • Having more say when it comes to local development • Places where people can talk about their emotional wellbeing • More community events and activities In addition to the impacts on the whole community, community leaders, i.e. parish councillors, also report increased levels of emotional distress, because of the demands of the role they play, in supporting the community to navigate the NSIP process. Parish councillors report feeling overwhelmed, both by technical information that is challenging to understand and interpret, and by the amount of time that needs to be invested in the process. Therefore, the burden of responsibility weighs heavily on a small number of people. Alongside their duty to represent the views of the community in the consultation process, parish councils also take their responsibility to support the wellbeing of their parish very seriously. However, they report that they receive no signposting, training, or guidance to assist them in this role. The cumulative effect of these issues has resulted in considerable impacts on the wellbeing of individuals, the overall wellbeing of the community, and has also led to an apparent loss of identity. One member of the public described how the association with the energy projects has, “created a perception that the nature of our village and parish…..has been completely altered, and is now one to be defined by the presence of large industrial complexes, rather than what it actually is, a rural community…….It remains a small rural village, with living breathing people, who strive to protect its unique quality.”