Local Aboriginal Land Council Powershift: Sharing the benefits of the energy transition
Resource Key: DNS2PT26
Document Type: Report
Creator:
Creators Name:
Place:
Institution: Australian Public Policy Institute (APPI)
Date: June 2025
Language: en
The Aboriginal land council estate presents a significant opportunity for the NSW Government to achieve its renewable energy targets. Across New South Wales (NSW), there is huge potential for Aboriginal land to be part of rapid renewable energy development. Local Aboriginal Land Councils (Aboriginal land councils) control most of the Aboriginal land estate in NSW, but much of the land estate is remote and difficult to service with existing power networks. Many land councils express increasing interest in hosting energy projects on their lands to achieve a range of social and economic outcomes. To date, the Aboriginal land council estate in NSW has not been actively used in the energy transition. This has limited both Aboriginal participation in the renewable energy transition and the realisation of social and economic benefits for Aboriginal communities. Activating the renewable energy potential of the Aboriginal land council estate would create a new avenue for renewable development in NSW and meet the aspirations of the NSW Electricity Infrastructure Roadmap and its associated First Nations Guidelines. Aboriginal land council participation is critical to the delivery of the Australian Government’s First Nations Clean Energy Strategy 2024–2030 and the National Agreement on Closing the Gap (Closing the Gap). Aboriginal land councils in NSW own and manage 447km2 of land estate, with future Aboriginal land claims amounting to 7,438km2. From a technical perspective, the entire current land estate (447km2) is suitable for solar, which is equivalent to 11GW of renewable energy (installed capacity) while 326km2 is suitable for wind energy projects equivalent to 1.6GW of renewable energy potential (installed capacity).1 If outstanding Aboriginal land claims are granted, the renewable energy potential of the Aboriginal land council estate will increase by approximately 19 times for solar energy projects, and approximately 22 times for wind energy projects. The primary barriers to Aboriginal land council participation in the energy transition are the limited capacity and resources within land councils, restricted networks to support land council-led planning and governance, and a lack of incentives for proponents to partner with Aboriginal land councils and utilise their land for energy projects. Prolonged delays in the processing of Aboriginal land claims continues to be a structural barrier for land councils. Not only do undetermined land claims prevent Aboriginal access and use of land which they are entitled to under the Aboriginal Land Rights Act (1983) NSW, it also restricts the use of prime land for renewable energy development by creating uncertainty about the status of vacant Crown Land. Case studies of three land councils (in Tibooburra, Hay and Brewarrina) demonstrate the potential for the NSW Aboriginal land estate to assist in driving the NSW Government’s renewable energy efforts and bring economic and social benefits to Aboriginal communities. The case studies demonstrate that the participation of individual Aboriginal land councils in the renewable energy transition is contingent on several factors: – the land council’s unique land asset portfolio, geography and proximity to energy infrastructure, – the demographics of the land council’s membership and the local Aboriginal community, and – local social and economic conditions. ‘Edge-of-grid’ settings like Brewarrina and Tibooburra Aboriginal land councils are located away from the main electricity grid and key electricity infrastructure. Local communities frequently face challenges related to energy reliability, resilience, and security. The geospatial research conducted during this study revealed that for these edge-of-grid land councils, there is land suitable for small-scale and mid-scale renewable energy projects, microgrids, and batteries that could address local energy supply issues. The study also revealed the potential for mid- to large-scale renewable energy projects. Hay Local Aboriginal Land Council is located in a Renewable Energy Zone (REZ). In this area, new renewable energy projects, storage facilities, and high-voltage transmission lines will be constructed to supply energy to NSW, South Australia, and Victoria. Geospatial analysis identified land under claim that is suitable for mid- to large-scale renewable energy. The three case studies provide lessons for land councils located inside and outside of existing REZs and highlight the significant potential for Aboriginal participation in the transformation of the NSW electricity system. There is a range of practical steps that the NSW Government could take to support Aboriginal land councils in both edge-of-grid and REZ settings to participate in – and benefit from – the energy transition. This paper identifies policy actions to realise the energy transition aspirations of Aboriginal land councils.